#6 — proposed extension v2 (Nov 12, 2026), profile cutaway

To scale, section through the bolt centreline. Heights in mm above the lead keel baseline. The fiberglass measures 39 mm, but the keel and hull faces aren't flush and leave an air gap of about 6–7 mm that won't close, so the backing plate top sits at about 54 as mounted.

Before — #6 as it stands

54 as mounted 72.2 tip (D2) 18 in nut #6: Full nut engagement, 0.2 proud M24 nut (18) 8 mm backing plate Fiberglass (39) Air gap ~7 Lead keel (baseline 0)

After — with extension · v2 (Nov 12, 2026)

M24 extension v2 (Nov 12, 2026) 8 excavation 37 shoulder 47 stud 54 as mounted 84 tip 92 total 30mm (10 threads) 3 2 18 Ø44 body 63 plate 75.7 excavation (63 + ½″) Full nut engagement, 12 proud Fiberglass hole enlarged to Ø46 up to ~38 only — stays clear of the backing plate Extension: Ø44 body, M24 female thread Existing M24 bolt, cut to 33 above excavation floor Tack weld (316 stainless filler) 63×63×6 plate, Ø44.3 hole, top flush with keel Lead keel (baseline 0)

Extension: XM-19 HS, ASTM A479 — MTR required; weld plate 316 stainless, tack welded with 316 stainless filler. M24 nut, 18 mm, seated on the backing plate with no washer (drawn across corners). The original bolt's thread starts at D1. Excavation 75.7 mm square (63 + ½″, the original plate's pocket widened chiselling it out), round the 63 mm plate. Assumed: the fiberglass hole is enlarged to Ø46 (about 1 mm clearance on the Ø44 body).